  • Design, supply, installation and commissioning of 8 ton/hr 21 bar biomass fired boiler along with 950 meters steam and condensate line, in New KCC
  • Design, supply, installation and commissioning of 5000 lits/hr of instant milk chilling plant along with 1 ton/hr 10 bar biomass fired boiler, in Tarakwa
  • Design, supply, installation and commissioning of 1000 lits/hr of complete milk processing plant along with yogurt cup filling and sealing machine, milk pouch filling machine, 60 ton weigh bridge in North rift dairies
  • Design, supply, installation and commissioning of 8 ton/hr 21 bar biomass fired boiler in New KCC
  • Design supply installation of 600 sq meter industrial Shed at Afriply industries

Nyahururu Kenya

  • Design, supply, installation and commissioning of 2 numbers 5 ton/hr 10 bar biomass fired boiler along with 300 meters steam and condensate line, 80 tons weigh bridge, in New KCC

Sotik Kenya

  • Design, supply, installation and commissioning of 2 numbers 3 ton/hr 10 bar biomass fired boiler along with 350 meters steam and condensate line, 80 ton weigh bridge in New KCC

Dandora Kenya

 

  •  Design, supply, installation and commissioning of 2 numbers 5 ton/hr 10 bar biomass fired boiler along with 200 meters steam and condensate line, in New KCC

Mombasa Kenya

  • Installation and commissioning of Thermax make 16 ton/hr biomass fired boiler along with one million Kcal Thermosyphon, Water Treatment Plant, along with DM and RO & Wastewater treatment plant with ETP and 3 numbers STP at Vipingo Industries
  • Installation of 2000 Sq Meters Tata Blue Scope Make Pre Fabricated Building in Kenya.

Zambia

  • Installation and Commissioning of 22 TPH, 46 Bar Bi Drum Boiler along with 2.5 MW Cogen Plant & 350 MT of Storage Tanks at Mazabuka

AGL Tanzania

  • Installation and Commissioning of 18 TPH FBC Boiler along with ATH, WTP at Kibaha